Customization: | Available |
---|---|
Standard: | DIN, ASTM, GOST, GB, JIS, ANSI, BS |
Technics: | Forging |
Still deciding? Get samples of US$ 120/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Parameters:
Item | Unit | JLP2-1 | JLP2-2 | JLP2.5-1 | JLP2.5-2 | JLP3-1 | JLP3-2 | JLP5 |
Capacity | kg | 2000 | 2500 | 3000 | 5000 | |||
Min.Fork Height | mm | 80 | 80 | 80 | 80 | |||
Max.Fork Height | mm | 200 | 190-200 | 190-200 | 190-200 | |||
Max. Lifting Height | mm | ≥110 | ||||||
Fork Width | mm | 550 | 685 | 550 | 685 | 550 | 685 | 685 |
Fork Length | mm | 1200 | ||||||
Fork Size | mm | 150*55 | 150*55 | 160*60 | 160*60 | |||
Loading Wheel | mm | φ80*70 | φ80*70 | φ80*70 | φ80*70 | |||
Steering Wheel | mm | φ180*50 | φ180*50 | φ180*50 | φ180*50 | |||
Material of wheel | Nylon | |||||||
Net Weight | kgs | - | 69 | 66 | 69 | 72 | 74 | 125 |
FAQ:
Q: How about sample policy?
A: The buyer should offer the cost and freight, if the quantity is big then can turn back all of it after
placing the order.
Q: What about the delivery time?
A: it depends on the order quantity and specification and the season you place the order. About
10-20days will be finished. If you need the order urgently, we can start overtime production for you.
Q: If i want to place a mini order?
A: Our minimum order quantity is ONE Piece.
Q: What is type of trading ?
A: We accept EXW, FOB, CFR, CNF, CIF etc.
Q: How about the payment term?
A: T/T, L/C, Western Union
Q: How about your quality control before shipment?
A: All products will have been strictly quality checked and tested in test house before packing. All
products will be well packed before shipping.
Packing AND Shipping:
Packaging way |
Standard seaworthy export packing, other types of packing can be customized as every requirement. |
Shipping packaging |
Bundled with firm steel straps, easy for loading and unloading. |
Shipping time on the way |
5-7 work days after delivery |
Shipping way |
BY SEA, BY TRAIN |
Shipping port |
TIANJIN PORT |