Galvanized Metal Dry Joint-hidden Wall Tile Stud Roll Forming Machine
- This is our hign configuration machine, The electromagnetic valve,Aviation plug,Touch screen,and so on.we use the brand such Mitsubishi,Matsushita,Siemens and so on.
- Also the oil pump,electric motor Reducer we use Yuken, all the part of the machine have best quality and more than 80 years life time.
- One roller mold is made up by two parts see follow ,you can used the spacers add in the two parts of the roller mold to changed the sizes of it then can manufactured different sizes of profiles.
1.
Profile |
Coil material thickness:0.3-0.8mm
Sizes: 76mm*35mm, 76mm*32mm
Processing Material :galvanized steel
Input Width(mm): according to drawings |
2.
Process flow |
Decoiler--Feeding--Forming--Servo track Cutting--Product Table
|
3.
Manual Decoiler |
1).Material coil inner diameter: 450mm-550mm
2).Max coil Width:500mm
3).Carrying capacity: 1.5T
4) Type of decoiler: Manual
5) Weight of decoiler: 100 KGS
|
4.
Forming System |
- .Roller station:12 stations
- .Shaft material:45# steel
Outer diameter:40mm
Roller material: Cr12MoV
- .Transport: chain transmission
- .Forming Speed: 15-25m/min
- Length Measurement:counter
- .Motor:3kw
- .Normal Size of Machine: 3.5mx1.2mx1.45m or as design
- .Voltage:380v,50Hz,3 phase (or as demand)
|
5. Cutting System |
1).Material: blade and mold material: Cr12MoV steel with quenched treated 60-62ºC
- .Cutting system: Advanced hydraulic drive, automatic cutting with no stop, no distorting or wasting, high level safety factor.
|
6. Control System |
6.1 Screen: touch screen
6.2 PLC: Delta
6.3 Automatic length measurement
6.4 Automatic quantity measurement
6.5 Computer is used to control length and quantity. Machine will automatically cut to length
6.6 Length inaccuracy can be amended easily |
7. Hydraulic System |
1). Hydraulic system made in china
2). Power:3kw
3) Oil: Hydraulic 46#
|
1. How long the machine could be made?- Normally speaking, light gauge steel frame machine could
be made without 45 working days. If you need machines in a hurry, we can make it for you
less than a month.
2. How to visit your company?
-a.Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),
then we can pick up you.
b.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5
hours), then we can
pick up you.
3. Do you have after sales support?
-Yes, we are happy to give advice and we also have skilled technicians available across the
world.We need your machines running in order to keep your business running.