• Drywall Metal U Track Roll Forming Machine
  • Drywall Metal U Track Roll Forming Machine
  • Drywall Metal U Track Roll Forming Machine
  • Drywall Metal U Track Roll Forming Machine
  • Drywall Metal U Track Roll Forming Machine
  • Drywall Metal U Track Roll Forming Machine

Drywall Metal U Track Roll Forming Machine

Warranty: 1 Year
Certification: CE, ISO9001
Customized: Customized
Condition: New
Control Type: Electric
Automatic Grade: Automatic
Customization:
Diamond Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
50-150
Product Name
Drywall Metal U Track Roll Forming Machine
Coil Material Thickness
0.3-0.8mm
Processing Material
Galvanized Steel
Roller Material
Cr12MOV 
Forming Speed
About 8-25m/Min
Main Motor Power
5.5kw
Hydraulic Station Power
2.2kw
Machines Size
About 3.8m*1.5m* 1.4m
Number of Work Stations
12stations
Max. Roll Shaft of Diameter
76mm
Transport Package
1.Control Box and Easy Damaged Parts:Protective PA
Specification
50-150
Trademark
Nexus Machinery
Origin
Cangzhou
HS Code
8455221000
Production Capacity
10

Product Description

Drywall Metal U Track Roll Forming Machine
 

 The difference between the Drywall Metal U Track Roll Forming Machine and the c z u purlin roll forming machine

1 The biggest difference between the c u w profile stud and purlin is that the thickness. The C U H purlin often used as the support of the building.The thickness range of the purlin is :2.0-4.0mm.while the c u w L light steel stud is :0.3-0.8mmso the c z u purline machine is much stronger , with big electric power and thick blade which can cut the purlin .

2  The c z u w channel stud is often used in ceiling and wall structure. The C Z Purlin and U purlin are used for supporting the ceiling from the ground.

Drywall Metal U Track Roll Forming Machine


Drywall Metal U Track Roll Forming Machine

 

Technical Parameters:

♥Suitable material: color steel sheet or galvanized steel sheet
♥Thickness of raw material: 0.3-0.8mm

♥Yield strength of material: 235Mpa-345Mpa

♥Forming speed: about 8-25m/min

♥Power Requirement :        

                                       Main motor power: 5.5Kw (Depend on final design)

                                       Hydraulic station power: 2.2Kw (Depend on final design)

♥Uncoilers loading capacity    Max. Capacity: 3000kgs (can be increased to be 10T)

♥Controlling system: Mitsubishi PLC & Converter

♥Machines weight: about 3-4T for different profile machine.

♥Machines size: about 3.8m×1.5m× 1.4m (Depend on final design)

2.Material of Main Equipment:

♥Roller Material:High grade No.45 forged steel, with digital-controlled procession,

                            Plated with hard chrome.

♥Active Shaft Material:    High grade No.45 carbon wrought steel,which can improve the  integrated mechanic feature of the shaft. Shaft diameter is 50mm.

♥Electric Elements: PLC control panel, transducer imported from Mitsubishi of Japan.

                                    Other elements from famous suppliers in China

♥Cutter blade and punch dies: Cr12 mould steel with quenched treatment

- Number of Work Stations..........................12stations

 - Max. Roll shaft of Diameter..........................76mm

 - Overall L x W x H (Approx.)...............3.8M*1.2M*1.6M

  - Roller material: GCR15 quenched 58°-62°,chromed

 - Outside is cast iron, surface needed polish and paint. Inside is 60# forge and press metal)

 - Transducer: Panasonic

 - Cages.......................... use the strong steel nets

 - Levelling screws on base ............with Thick metal paltes


Drywall Metal U Track Roll Forming Machine

Drywall Metal U Track Roll Forming Machine
Drywall Metal U Track Roll Forming Machine



ABOUT US:

Drywall Metal U Track Roll Forming Machine

Drywall Metal U Track Roll Forming Machine
Drywall Metal U Track Roll Forming Machine


FAQ:
1. How long the machine could be made?- Normally speaking, light gauge steel frame machine could 
be made without 45 working days. If you need machines in a hurry, we can make it for you 
less than a month.
2. How to visit your company?
-a.Fly to Beijing airport:   By high speed train From Beijing Nan to Cangzhou Xi (1 hour), 
then we can pick up you.
b.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 
hours), then we can 
pick up you.
3. Do you have after sales support?
-Yes, we are happy to give advice and we also have skilled technicians available across the 
world.We need your machines running in order to keep your business running.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now