Electric Stacking Machine with Adjustable Height for Double Layer Roofing Sheets Production
With a stacker, sheets are protected from scratches all the while keeping your rollformer in production. The sheets stay protected by sliding along the rollers and guides rather than each other. The motorised powered stacker arms are triggered by switch which releases the panels and drops them onto the stacked sheets manually. The design of both stackers allows for minimal drop distance of the panel which is critical key to a successful stacker. The drop distance is normally four inches. The less distance the sheet has to drop, the more uniform the stacked sheets will be.
Once an order is compete, the discharge table transfers the order onto the C-frames for packaging by manual , then returns back to the stacker to allow the rollformer to stay running. The discharge table is fully powered - in, out, up, down. This creates a higher production rate and in turn, makes your company more profitable.
1. Processing flow diagram of Whole Production Line:
Decoiler→ Feeding →Roll forming →Measure length →Hydraulic cutting →Output table(Automatic Stacker)
2. Technical parameters:
Electric Stacking Machine with Adjustable Height for Double Layer Roofing Sheets Production |
Main motor power |
2.2kw |
Drive |
motorized |
material |
45# forge steel and quenched |
Length of stacker |
6m |
Weight of stacker |
About 2 ton |
Size of stacker |
About 6000×1800×1200mm L x W x H |
Color of stacker |
Yellow and Blue or Customized |
3. Equipment list :
No. |
Product Name |
QTY |
1 |
Electric Stacking Machine with Adjustable Height for Double Layer Roofing Sheets Production |
1 |
4. Guarantee:
1) Engineer will give free training lessons to labors in buyer's factory.
2) The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD100 per day for engineer.
3) During this guarantee period, we will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, we will provide the buyer spare parts at cost price.
4). We will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
5. Photos of Electric Stacking Machine with Adjustable Height for Double Layer Roofing Sheets Production Line for Reference:
FAQ:
1. How long the machine could be made?- Normally speaking, stacker machine could
be made within 45 working days. If you need machines in a hurry, we can make it for you less than a month.
2. How to visit your company?
-a.Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),
then we can pick up you.
b.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours), then we can pick up you.
3. Do you have after sales support?
-Yes, we are happy to give advice and we also have skilled technicians available across the world.We need your machines running in order to keep your business running.